Norske Skog revaluation leaves Kawerau picking up $1m shortfall

7:19 pm on 19 April 2022

Kawerau District Council ratepayers will have to pick up a rating shortfall of more than $1 million resulting from the closure and subsequent revaluation of Norske Skog mill.

Norske Skog mill

File image: Norske Skog mill. Photo: LDR / Diane McCarthy

Since it closed at the end of June, the ratable value of the property has dropped from over $120m to $66m. This year it paid over $2.5m in rates, close to a quarter of the council's rates income.

The council released a consultation document on its proposed Annual Plan last week, asking the community to provide feedback on how that shortfall should be funded through rates and also, on a potential income creation scheme to create a secure asbestos containment site at the old rubbish dump.

The proposed plan includes an average general rate increase of 4.4 percent, which falls within the parameters outlined in last year's long-term plan of between 2.1 and 4.8 percent. Reasons given for the increase are inflation, additional depreciation and loan costs.

However, how rates would be distributed across the community would be affected by the closure of the town's biggest industrial site.

no metadata

In Kawerau, commercial and industrial properties pay 55 percent of the general rate and residential properties pay 45 percent.

With the significant reduction in ratable value of the Norske Skog property, the council is looking at two options for how to spread the rating shortfall. Its preferred option is to keep to the status quo, or a second option would see the changing the share of the general rate to 50 percent residential and 50 percent commercial/industrial properties.

In the first option, residential rates would increase only by the average rate rise of 4.4 percent while commercial and industrial sector rates would shoulder the shortfall from Norske Skog, resulting in a rates increase of 34.6 percent.

In the 50/50 option, residential rates would rise by 16.1 percent, while commercial and industrial rates would rise by 22.5 percent. These figures assume that there is no alteration to the level of service planned for the district.

Incorporated in these figures is a 1.8 percent reduction in rates estimated from the development of a secure asbestos containment site at the old landfill near the Kawerau Transfer Station. The council is also asking for feedback on this plan.

Ongoing development in the district has uncovered deposits of asbestos-contaminated material and the council thinks it is likely that additional deposits will be unearthed. It is paying a significant amount to dispose of asbestos contaminated soil from the Central Cove building site outside of the region.

The site already has a secure asbestos cell and the proposed new containment site would be an expansion of the existing structure.

The council estimates that between 2000 and 5000 cubic metres of asbestos contaminated soil and 300 cubic metres of asbestos is collected annually in the Eastern Bay. The first stage of the containment site proposal will have a capacity of at least 10,000 cubic metres at minimal investment outlay.

The community has until 18 May to have its say on the proposals. Anyone wanting to be heard at a submission hearing can do so on 31 May or 7 June. Councillors will deliberate on the submissions on 14 June and adopt the annual plan on 28 June. The council is also planning a series of face-to-face meetings with the public, the details of which will be available in the next few days.

Local Democracy Reporter is Public Interest Journalism funded through NZ on Air

Get the RNZ app

for ad-free news and current affairs